Home‎ > ‎About Us‎ > ‎

Jeffery Jim


                         
Name

Degree
Masters  



Accreditation






Past Designations




Thesis


Research Papers and Publications











International Papers (Assisted)














Past Projects


















































































Other Portfolios








Designs, Works and Studies
Commissioned








Misc Projects




Training
Ir. Jeffery jim MIEM, P.ENG (MCS Principal)

Bachelor in Engineering (Civil), University of Technology Malaysia, 2000
Masters in Science (Project Management, IT in Construction Industry,University of Technology Malaysia, (Partially Completed), 2001
Masters in Business Administration, University Malaysia Sabah, 2017

Registered Civil Engineer with the Board of Engineer, Malaysia
Member to The Institution of Engineers, Malaysia   
Internal Auditor for ISO 9001:2000
Primavera P6 Course

________________________________________________________________________

Researcher, Programmer, Project coordinator, Project Manager, Assistant Technical Director, M&E and IT Adviser, Resident Engineer for Construction (Specializing in structure repair and rehabilitation works)

________________________________________________________________________

Construction Industry Information System Using Web-based Technology, 2000


* The Development of an Integrated System for Design and Construction in Distributed Environment (Vot:72254),

* The Development of an Intelligent Scheduling Productivity Assessment System Prototype, Developing Design Standard Library For Integrating Design And  Construction,

* The Development of an Intelligent Information Model for Construction Method Assessment in an Integrated Environment (Vot:72268),

* Developing Design Standard Library For Integrating Design and Construction  (Vot:71494)


- 'Building Space Analysis for Integrating design and construction, Taking the construction industry into the 21st century'. ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 -30 2000;

- ‘Integrating Construction Scheduling and Knowledge-based Systems for Generating Material Scheduling, Che Wan Fadhil Che Wan Putra, Muhd ZaimiAbd. Majid and Narimah Kasim, APSEC 2000, 13-15 September 2000;

- ‘Alternative Approach to Assess Communication Performance at Construction Sites’, Che Wan Fadhil Che Wan Putra, Muhd Zaimi Abd. Majid and Narimah Kasim, APSEC 2000, 13-15 September 2000;

- 'Integrating design and construction: a new approach'. Che Wan Putra, Che Wan Fadhil and Mustafa Alshawi, IAARC Taipei, 2000
________________________________________________________________________


- Period November 2001 until November 2002
Project Engineer
Design, Construction, Completion & Maintenance Of Anyut Paku Road, Sri Aman Division, Sarawak.

- Period November 2001 until May 2005
Project Coordinator
Design, Construction, Completion & Maintenance Of SMK Asyakirin, Bintulu, Sarawak.

- Period September 2002 until July 2005
Project Coordinator & Site Engineer
Construction And Completion Of Proposed 54 Unit Of Teachers Quarters At Baram, Sarawak.

- Period November 2004 until May 2005
Project Coordinator
Proposed Renovation To Petronas Service Station On Lot 419, Block 26 Kemena Land District At Jalan Kidurong, Bintulu, Sarawak.

- Period February 2006 until June 2006
Project Coordinator
Classified Project involving GIS and construction works

- Period February 2006 until May 2007
Project Manager (up to early phase)
Pembinaan Masjid baru Kampung Rajang di atas Lot 189, Kampung Rajang, Daerah Kecil Belawai, Bahagian Mukah, Sarawak. (Construction of a Mosque)

- Period June 2006 until August 2008
Assistant Technical Director, IT Advisor
34 Lots Renovation for Kastam DiRaja Malaysia with furniture package, Tanjung Aru, Kota Kinabalu, Sabah

- Period September 2008 until April 2009
Resident Engineer
Projek Pembaikan/Menaiktaraf Jeti-Jeti Penumpang dan gunasama Di Dermaga Merdeka, Wilayah Persekutuan Labuan (Jetty repair and upgrading at Liberty Port, Labuan) & Projek Pembaikan/Menaiktaraf Jeti-Jeti Ro-Ro dan Barter Trade di Wilayah Persekutuan Labuan (Upgrading of Ro-Ro Jetty)

- Period April 2010 to January 2011
Resident Engineer
Cadangan kerja-kerja kecemasan untuk kerja-kerja pembaikan bangunan sekolah di Sekolah Menengah Kebangsaan Elopura (Bestari), Sandakan, Sabah (Perolehan Darurat AP173.2) (Emergency structure rehabilitation and repair for a school)

- Period January 2010 to July 2010
Senior QC Engineer
KIBS (Precast reinforced concrete & IBS modular installation works

- Period January 2010 to Present
Partner of Civil & Structure Design Firm
Design Works for Structural & Engineering Works, Infrastructure & Civil Works, Arbitration and mediation in regards to construction and built, Geotechnical designs, Seismic Analysis for Kundasang area, project management, and supervision management.

- Period January 2012 to Present
Project Control Engineer / Planner
Kimanis Petroleum Training Center, SOGT - PETRONAS
Project Planning, and Project and cost control

- Period January 2013 to March 2013
Project Initial Planning Adviser
Sabah Ammonia Urea (SAMUR) PETRONAS Project - Package 2 and 3 Civil Works
Project Planning, and Project and cost control

- Period February 2013 to Present
Project Planning Adviser
Sabah Ammonia Urea (SAMUR) PETRONAS Project - Package 2 Building Works
Project Planning, and Project and cost control

- Period July 2013 to June 2015
Project Planning Adviser
Proposed Development of 1,000 units of 5-Storey Walk-up Apartment on TL.077582864, 077582873, 077582819, 077582837, 077582882, 077582855, 077582908, 077582846, 077582891, 077582828 at Mile 3, Jalan Bomba, Off Jalan Utara, Sandakan, Sabah.


________________________________________________________________________


Construction:

Engineering:
- Associate Senior Engineer for Alamega Konsult.
- Associate Senior Engineer for Jurutera Inovasi.
- Associate Senior Engineer for UM Jurutera.
- Associate Senior Engineer for Konsultan Azam Sempurna
- Affiliate Senior Engineer for SARG Konsult.


- Concrete, Steel, Timber and/or Hybrid Structures,
- Structure Forensic, Repair and Rehabilitation Works,
- Marine structures,
- GIS, Geotechnical and Seismic Studies,
- Urban Stormwater Management, Drainage, Channel, Sewerage and Hydrology,
- Road, Bridges and Traffic Design, and
- Effective Bidding, Bid preparations, Contract Disputes and Project Management.


________________________________________________________________________


- Period 2004 until 2005
Regional Marketing Manager (Asia Pacific) -Marketing The Eagle 150B and Lancair Columbia. Light & luxury aircraft


Mac 1998     
SMART-CEP -Solidarity In Movement and Observation Of Advanced Technology For Civil Engineering Purpose.
Dec 2002   
Fire Safety - Performance Based Approach by Bomba
Mar 2003    
Safety Course for CIDB Registration by CIDB
Apr 2003    
Management Representative for ISO 9001:2000
Jul 2003     
Internal
Auditor for ISO 9001:2000 by Peplow Warren
May 2004   
Product Familiarization Program for Eagle 150B by CTRM
Sep 2004   
Information Management in Construction Projects
Mac 2006   
ArchGIS and remote sensing introductory by RESGIS
June 2006  
Hands-on Training for M&E installation work
Feb 2012
Primavera Project Planning P6


                    
  
                   
Comments