Jeffery Jim

Name

Degree

Masters  

Accreditation

Past Designations

Thesis

Research Papers and Publications

International Papers (Assisted)

Past Projects

Other Portfolios

Designs, Works and Studies

Commissioned

Misc Projects

Training

Ir. Jeffery jim MIEM, P.ENG (MCS Principal)

Bachelor in Engineering (Civil), University of Technology Malaysia, 2000

Masters in Science (Project Management, IT in Construction Industry,University of Technology Malaysia, (Partially Completed), 2001

Masters in Business Administration, University Malaysia Sabah, 2017

Registered Civil Engineer with the Board of Engineer, Malaysia

Member to The Institution of Engineers, Malaysia   

Internal Auditor for ISO 9001:2000

Primavera P6 Course

________________________________________________________________________

Researcher, Programmer, Project coordinator, Project Manager, Assistant Technical Director, M&E and IT Adviser, Resident Engineer for Construction (Specializing in structure repair and rehabilitation works)

________________________________________________________________________

Construction Industry Information System Using Web-based Technology, 2000

* The Development of an Integrated System for Design and Construction in Distributed Environment (Vot:72254),

* The Development of an Intelligent Scheduling Productivity Assessment System Prototype, Developing Design Standard Library For Integrating Design And  Construction,

* The Development of an Intelligent Information Model for Construction Method Assessment in an Integrated Environment (Vot:72268),

* Developing Design Standard Library For Integrating Design and Construction  (Vot:71494)

- 'Building Space Analysis for Integrating design and construction, Taking the construction industry into the 21st century'. ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 -30 2000;

- ‘Integrating Construction Scheduling and Knowledge-based Systems for Generating Material Scheduling, Che Wan Fadhil Che Wan Putra, Muhd ZaimiAbd. Majid and Narimah Kasim, APSEC 2000, 13-15 September 2000;

- ‘Alternative Approach to Assess Communication Performance at Construction Sites’, Che Wan Fadhil Che Wan Putra, Muhd Zaimi Abd. Majid and Narimah Kasim, APSEC 2000, 13-15 September 2000;

- 'Integrating design and construction: a new approach'. Che Wan Putra, Che Wan Fadhil and Mustafa Alshawi, IAARC Taipei, 2000

________________________________________________________________________

- Period November 2001 until November 2002

Project Engineer

Design, Construction, Completion & Maintenance Of Anyut Paku Road, Sri Aman Division, Sarawak.

- Period November 2001 until May 2005

Project Coordinator

Design, Construction, Completion & Maintenance Of SMK Asyakirin, Bintulu, Sarawak.

- Period September 2002 until July 2005

Project Coordinator & Site Engineer

Construction And Completion Of Proposed 54 Unit Of Teachers Quarters At Baram, Sarawak.

- Period November 2004 until May 2005

Project Coordinator

Proposed Renovation To Petronas Service Station On Lot 419, Block 26 Kemena Land District At Jalan Kidurong, Bintulu, Sarawak.

- Period February 2006 until June 2006

Project Coordinator

Classified Project involving GIS and construction works

- Period February 2006 until May 2007

Project Manager (up to early phase)

Pembinaan Masjid baru Kampung Rajang di atas Lot 189, Kampung Rajang, Daerah Kecil Belawai, Bahagian Mukah, Sarawak. (Construction of a Mosque)

- Period June 2006 until August 2008

Assistant Technical Director, IT Advisor

34 Lots Renovation for Kastam DiRaja Malaysia with furniture package, Tanjung Aru, Kota Kinabalu, Sabah

- Period September 2008 until April 2009

Resident Engineer

Projek Pembaikan/Menaiktaraf Jeti-Jeti Penumpang dan gunasama Di Dermaga Merdeka, Wilayah Persekutuan Labuan (Jetty repair and upgrading at Liberty Port, Labuan) & Projek Pembaikan/Menaiktaraf Jeti-Jeti Ro-Ro dan Barter Trade di Wilayah Persekutuan Labuan (Upgrading of Ro-Ro Jetty)

- Period April 2010 to January 2011

Resident Engineer

Cadangan kerja-kerja kecemasan untuk kerja-kerja pembaikan bangunan sekolah di Sekolah Menengah Kebangsaan Elopura (Bestari), Sandakan, Sabah (Perolehan Darurat AP173.2) (Emergency structure rehabilitation and repair for a school)

- Period January 2010 to July 2010

Senior QC Engineer

KIBS (Precast reinforced concrete & IBS modular installation works

- Period January 2010 to Present

Partner of Civil & Structure Design Firm

Design Works for Structural & Engineering Works, Infrastructure & Civil Works, Arbitration and mediation in regards to construction and built, Geotechnical designs, Seismic Analysis for Kundasang area, project management, and supervision management.

- Period January 2012 to Present

Project Control Engineer / Planner

Kimanis Petroleum Training Center, SOGT - PETRONAS

Project Planning, and Project and cost control

- Period January 2013 to March 2013

Project Initial Planning Adviser

Sabah Ammonia Urea (SAMUR) PETRONAS Project - Package 2 and 3 Civil Works

Project Planning, and Project and cost control

- Period February 2013 to Present

Project Planning Adviser

Sabah Ammonia Urea (SAMUR) PETRONAS Project - Package 2 Building Works

Project Planning, and Project and cost control

- Period July 2013 to June 2015

Project Planning Adviser

Proposed Development of 1,000 units of 5-Storey Walk-up Apartment on TL.077582864, 077582873, 077582819, 077582837, 077582882, 077582855, 077582908, 077582846, 077582891, 077582828 at Mile 3, Jalan Bomba, Off Jalan Utara, Sandakan, Sabah.

________________________________________________________________________

Construction:

Engineering:

- Associate Senior Engineer for Alamega Konsult.

- Associate Senior Engineer for Jurutera Inovasi.

- Associate Senior Engineer for UM Jurutera.

- Associate Senior Engineer for Konsultan Azam Sempurna

- Affiliate Senior Engineer for SARG Konsult.

- Concrete, Steel, Timber and/or Hybrid Structures,

- Structure Forensic, Repair and Rehabilitation Works,

- Marine structures,

- GIS, Geotechnical and Seismic Studies,

- Urban Stormwater Management, Drainage, Channel, Sewerage and Hydrology,

- Road, Bridges and Traffic Design, and

- Effective Bidding, Bid preparations, Contract Disputes and Project Management.

________________________________________________________________________

- Period 2004 until 2005

Regional Marketing Manager (Asia Pacific) -Marketing The Eagle 150B and Lancair Columbia. Light & luxury aircraft

Mac 1998     

SMART-CEP -Solidarity In Movement and Observation Of Advanced Technology For Civil Engineering Purpose.

Dec 2002   

Fire Safety - Performance Based Approach by Bomba

Mar 2003    

Safety Course for CIDB Registration by CIDB

Apr 2003    

Management Representative for ISO 9001:2000

Jul 2003     

Internal

Auditor for ISO 9001:2000 by Peplow Warren

May 2004   

Product Familiarization Program for Eagle 150B by CTRM

Sep 2004   

Information Management in Construction Projects

Mac 2006   

ArchGIS and remote sensing introductory by RESGIS

June 2006  

Hands-on Training for M&E installation work

Feb 2012

Primavera Project Planning P6