Q1. You are the infrastructure engineer for a 500 acre housing development scheme. What is your advice to the Developer, Planners and Architects in terms of requirements for drainage for the whole development?
Q2. A 3-storey basement car park is to be built with an excavation of approximately 15.0m from the existing ground level. The water table is 1.0m below the existing ground level. You are required to provide a solution on the structural system for the retaining walls of the basement.